Fortified Concrete & Construction

Bathroom remodeling

Which bathroom selections need to be made before framing closes?

Choose the vanity, sink, valve and trim, shower or tub, mirror and lighting early enough to check how they fit together. Final dimensions and installation sheets let the plumber, electrician and carpenter coordinate the room while the wall is open.

Work from actual cut sheets

A 36-inch vanity can have drawers on the left, the right or both sides. Bring the chosen cabinet drawing to the plumber so the connections do not land behind a drawer. Check faucet hole count, spout reach, countertop thickness and the space for the trap and shutoffs.

Measure the space in use

Mark finished wall faces and the door swing on a sketch. Open drawers, picture a person stepping out of the shower and check the reach to towels or a hand shower. If future grab bars are part of the plan, agree on locations and appropriate backing before wallboard covers the framing.

Coordinate the ceiling as well

Locate the mirror lighting and fan together with the ceiling layout and exhaust route. For moisture control, EPA recommends checking that a bath fan actually moves air and exhausts outdoors. Give the selected fan information to the trade laying out the duct path.

U.S. EPA · Bathroom ventilation

Bring to the layout meeting

  • Product cut sheets and fixture finishes
  • Door and drawer swings on a measured sketch
  • Locations for accessories, lighting and future backing

Related guides