Start with the parts of the room you need to use again. In a bathroom that may mean a sound floor, a working vanity and a shower that stays watertight. Your rebuild estimate should show what can stay, what needs replacing and how each new finish will meet the old.
Drywall can go back when the water source is fixed, remaining materials are dry enough to enclose, and work that needs the open wall is complete. Ask about the bottom corners and the edges of nearby cabinets, where moisture can be easy to overlook.
A useful rebuild estimate follows each room from its current condition to a finished, usable space. It identifies who supplies the materials, who handles reconnections and how hidden damage or changes to the finish selection will be priced.
Build a simple folder for each room with an overall view, close-ups of removed finishes and the repair or drying records for that space. The contractor should be able to recognize which wall a close-up belongs to without guessing.
Plan the sequence around access, inspections and materials that cover earlier work. Rough repairs and moisture checks come before closure. Finish choices and product instructions then determine the order of cabinets, flooring, paint, trim and fixture resets.
Walk the agreed scope room by room with the person responsible for the rebuild. Check the appearance of repaired surfaces and the ordinary use of doors, drawers, fixtures and flooring. Record any open item with a location, responsible party and follow-up date.