Prepare the opening
Before new board goes up, we check that the area is dry enough to close, that any required inspection is complete and that nothing behind it still needs access.
Fortified closes access holes after plumbing work, replaces damaged sections of drywall and matches the finish to the surrounding wall or ceiling.

Before new board goes up, we check that the area is dry enough to close, that any required inspection is complete and that nothing behind it still needs access.
Fit new board, support edges and finish joints and corners to suit the surrounding wall or ceiling.
Review texture, primer and paint boundaries. Side lighting can make a small patch visible across the room.
Include a photo of the room and one of the opening. Note what caused the damage and whether access is still needed.